|
NewsAward of Contract - Loan 3730/ Grant 0621 - KGZ: CAREC Corridors 1 and 3 Connector Road Project, Phase 2 - Additional Financing (ADB). Engineering and Construction Supervision Loan 3730/ Grant 0621 - KGZ: CAREC Corridors 1 and 3Connector Road Project, Phase 2 - Additional Financing (ADB). Engineering and Construction Supervision - Award of Contract. The Ministry of Transport and Roads of the Kyrgyz Republic completed the consultant selection process for Rehabilitation of CAREC Corridors 1 and 3 Connector Road including a 5-year performance-based contract - Lot 1 Section 1 Balykchy - Kochkor (km 0 - km 43) and Lot 2 Section 2A Kochkor - Epkin (km 62+400 - km 88+500). Names of the shortlisted consultants who submitted proposals: № | Name of the Consultant | Submission of proposal Yes/No | 1. | JV between Dasan Consultants Co., Ltd. and Dongsung Engineering Co., Ltd in association with RAM Engineering Associates LLC, South Korea | Yes | 2. | Roughton International Ltd in association with ОсОО RAM Engineering Associates, United Kingdom | Yes | 3. | Tera International Group, Inc., USA. | No | 4. | JV between Oriental Consultants Global Co., Ltd. and EMAY International Engineering and Consultancy Inc. in association with FNT Consultants, Japan | Yes | 5. | ULUSLARARASI B?RLE?M?? MÜ?AV?RLER MÜ?AV?RL?K H?ZMETLER? A.?. UBM INTERNATIONAL UNITED CONSULTANTS INC., Turkey | Yes | 6. | JV between IRD Engineering S.R.L. and ООО Rhythm Plus, Italy | Yes | Scores of their technical proposals. No. | Наименование компании | Балл за техническое предложение | 1 | JV between Dasan Consultants Co., Ltd. and Dongsung Engineering Co., Ltd in association with RAM Engineering Associates LLC | 784,10 | 2 | Roughton International Ltd in association with ОсОО RAM Engineering Associates | 796,15 | 3 | JV between Oriental Consultants Global Co., Ltd. and EMAY International Engineering and Consultancy Inc. in association with FNT Consultants | 806,15 | 4 | ULUSLARARASI B?RLE?M?? MÜ?AV?RLER MÜ?AV?RL?K H?ZMETLER? A.?. UBM INTERNATIONAL UNITED CONSULTANTS INC. | 797,10 | 5 | JV between IRD Engineering S.R.L. and ООО Rhythm Plus | 797,40 | Points of their technical and financial proposals, prices in their financial proposals and overall ranking. No. | Name | Points | Price of the Financial proposal | Evaluated total price, USD | Overall ranking | Technical | Financial | 1 | JV between Dasan Consultants Co., Ltd. and Dongsung Engineering Co., Ltd in association with RAM Engineering Associates LLC | 784,10 | 918,00 | 4 783 505 USD (excluding all indirect local taxes) | 4 212 850,00 | 5 | 2 | JV between IRD Engineering S.R.L. and ООО Rhythm Plus | 797,40 | 940,56 | 4 682 465 USD (excluding all indirect local taxes) | 4 111 810,00 | 3 | 3 | JV between Oriental Consultants Global Co., Ltd. and EMAY International Engineering and Consultancy Inc. in association with FNT Consultants | 806,15 | 907,10 | 4 808 955 USD (excluding all indirect local taxes) | 4 263 500,00 | 2 | 4 | Roughton International Ltd in association with ОсОО RAM Engineering Associates | 796,15 | 1 000,00 | 4 438 055 USD (excluding all indirect local taxes) | 3 867 400,00 | 1 | 5 | ULUSLARARASI B?RLE?M?? MÜ?AV?RLER MÜ?AV?RL?K H?ZMETLER? A.?. UBM INTERNATIONAL UNITED CONSULTANTS INC. | 797,10 | 925,16 | 4 750 891 USD (excluding all indirect local taxes) | 4 180 236,00 | 4 | | | | | | | | | - The Name of the winning consultant: Roughton International Ltd in association with ОсОО RAM Engineering Associates.
- The contract sum: 4,438,055.00 USD (excluding all indirect local taxes).
- Duration of the contract: 84 months.
- Summary scope of the contract: Consulting Services for Engineering and Construction Supervision.
|
Transport corridors Gallery All photos |
|